Riverbed Protection @ Tailing 2 in Artana PDF

web_003.jpg   Sterile material tailing from Artana mine is located on western part of Novobrdo settlement. Earth Protection barrier which protects moving of storage material from water to river Kriva reka is constructed partially. The height of for protection of stored material is 3.0 m, and the height of stored material is higher than 20 m (according site survey, lower is 520.00 nmm, and upper level is 633.00nmm).Protection should be done to secure existing material from erosion into kriva Reka River. Material is dumped close to Krivareka River, and during falls, dumped material goes to river, so for this issue protection structures need to be built to protect material to be discharged in river. The best solution will be construction of natural clay embankment taken on site.

web_mg_1550.jpgProject was successfully completed as per drawings and specified ToR.

 
Next >
You are here  :Regional Office arrow UNMIK Kosovo arrow Activities arrow Clean-up arrow Riverbed Protection @ Tailing 2 in Artana